[an error occurred while processing this directive]

NIST Time Scale Data Archive - 2002
Notes on NIST time scale, primary standards & services


  Return to Archive index   2003 2004 2005 2006 2007 2008 Current Year

Primary frequency standards developed and maintained by NIST are used to provide accuracy (rate) input to the BIPM. NIST-7, which has served as the U.S. primary standard since 1994, has been replaced by NIST-F1, a cesium fountain frequency standard. The uncertainty of the new standard is currently 1.3 parts in 1015.

The AT1 scale is run in real time using data from an ensemble of cesium standards and hydrogen masers. It is a free-running scale whose frequency is maintained as constant as possible by choosing the optimum weight for each clock that contributes to the computation.

UTC(NIST) is generated as an offset from our real-time scale AT1. It is steered in frequency towards UTC using data published by the BIPM in its Circular T. Changes in the steering frequency are usually made at 0000 UTC on the first day of any month, and the change in frequency in any month is limited to ±2 ns/day. The frequency of UTC(NIST) is kept as stable as possible at other times.

UTC is generated at the BIPM using a post-processed time-scale algorithm and is not available in real-time. The parameters that we use to generate UTC(NIST) in real-time are therefore based on an extrapolation of UTC from the most recent data available.

The table lists the parameters that are used to define UTC(NIST) with respect to our real-time scale AT1. To find the value of UTC(NIST) - AT1 at any time T (expressed as a Modified Julian Day, including a fraction if needed), the appropriate equation to use is the one for which the desired T is greater than or equal to the entry in the T0 column and less than the entry in the last column. The values of xls, x, and y for that month are then used in the equation below to find the desired value. The parameters x and y represent the offset in time and in frequency, respectively, between UTC(NIST) and AT1; the parameter xls is the number of leap seconds applied to both UTC(NIST) and UTC as specified by the IERS. Leap seconds are not applied to AT1.

   

UTC(NIST) - AT1 = xls + x + y(T - To)

Month xls(s) x (ns) y (ns/day) To (MJD) Valid
until 0000
UTC on:
MJD)
2002-12 -32 -243813 -40.5 52630 52640
2002-12** -32 -242964.6 -40.4 52609 52630
2002-11 -32 -242399 -40.4 52595 52609
2002-11** -32 -241751 -40.5 52579 52595
2002-10 -32 -240497 -40.75 52548 52579
2002-09 -32 -240252.5 -40.5 52542 52548
2002-09** -32 -239274.5 -40.75 52518 52542
2002-08 -32 -238577.5 -41 52501 52518
2002-08** -32 -238014.25 -40.25 52487 52501
2002-07 -32 -236766.5 -40.25 52456 52487
2002-06 -32 -236046.5 -40 52438 52456
2002-06** -32 -235560.5 -40.5 52426 52438
2002-05 -32 -234960.5 -40 52411 52426
2002-05** -32 -234296.5 -41.5 52395 52411
2002-04 -32 -233558.5 -41 52377 52395
2002-04** -32 -233072.5 -40.5 52365 52377
2002-03 -32 -232829.5 -40.5 52359 52365
2002-03** -32 -231829.5 -40.0 52334 52359
2002-02 -32 -231255.5 -41 52320 52334
2002-02** -32 -230695.5 -40.0 52306 52320
2002-01 -32 -230169 -40.5 52293 52306
2002-01** -32 -229467 -39.0 52275 52293

* Provisional Value

** Rate Change in mid-month

Bibliography

Home